Doepke e.Guard

Less testing effort, greater system availability

Electrical installations must be inspected at regular intervals. In many cases, this requires time-consuming insulation resistance measurements.
The consequences:

  • downtime caused by de-nergising the installation
  • time and labour costs associated with insulation testing
  • costs resulting from production downtime
  • de-energisation is not feasible in certain applications (e.g. servers and IT infrastructure)

According to German installation standard DIN VDE 0105-100/A1:2017-06, Clause 5.3.3.101.0.2, periodic insulation resistance testing may be omitted, provided that the following conditions are met:

  • A residual current monitoring device in accordance with


DIN EN 62020 (VDE 0663) is installed.

  • The residual current monitoring (RCM) system is operating correctly.
  • Continuous monitoring is ensured.

The solution: Doepke e.Guard

Doepke e.Guard is an intelligent residual current monitoring system compliant with DIN EN 62020 (VDE 0663) for the continuous monitoring of electrical installations. By using e.Guard, companies can:

  • increase system availability
  • significantly reduce inspection effort – the qualified electrician only needs to evaluate the automatically collected data
  • automatically document the recorded data
  • save time and reduce costs
  • detect changes in the condition of the installation at an early stage
  • gain valuable insights for preventive maintenance
  • improve the safety of their installations by enhancing equipment and fire protection in applications where RCCBs cannot be used because of high operational leakage currents